Laser Powder Bed Fusion
Thin-wall titanium, Inconel, aluminum, and stainless parts with controlled build orientation and documented powder handling.
Get Quote →
Authority-grade metal AM
Velo3d supports complex additive manufacturing programs with DfAM review, build strategy, inspection planning, and release documentation shaped for regulated OEM buyers.
Thin-wall titanium, Inconel, aluminum, and stainless parts with controlled build orientation and documented powder handling.
Get Quote →Geometry risk review, support strategy, lattice validation, thermal distortion planning, and manufacturability notes before release.
Get Quote →Parameter selection, coupon plans, CT or CMM inspection routes, and FAI-ready traceability for first-article programs.
Get Quote →Stress relief, HIP, machining datum cleanup, surface finishing, and serial-number control routed through one engineering desk.
Get Quote →Small-batch repeat builds, revision control, material certificates, and delivery plans for hardware moving from prototype to launch.
Get Quote →
Engineering controls
Capability matrix
Typical alloysTitanium, Inconel, stainless steel, aluminum, tool steel
Geometry focusInternal channels, lightweight brackets, manifolds, combustor hardware, conformal cooling
InspectionCMM, optical scan, CT by requirement, surface roughness, coupon testing
Release packFAI, material certificates, build record, heat treatment, post-process traveler
Evidence package
ISO 9001Quality management foundation
AS9100D workflowAerospace release discipline
ITAR routingControlled defense program handling
FAI packageFirst-article documentationIndustries we serve

AS9100D + FAI
See case studies →
ITAR + DFARS
See case studies →
High-temperature alloys
See case studies →
Lightweight propulsion
See case studies →
Validated materials
See case studies →
Complex end effectors
See case studies →
Rapid design loops
See case studies →
Repeatable fixtures
See case studies →Attach STEP, STL, 3MF, or a drawing package. We will route the request to DfAM, quality, and production planning before quotation.
Start Technical Review